Repeat Client: City of Visalia
Recreation Park
Visalia, CA
Project includes construction new bull pen in left field, wiffle ball field and grounds keeping structures, in addition to a complete new right field section with a two story brick facade building structure to house concessions, kitchen area and a terrace seating level. The improvements also include a new seating section and grass seating area.in front of the building.
News
New Client: Fresno Unified School District
Modernizations of Dailey & Fremont Elementary Schools
Fresno, CA
Project includes construction services on two Fresno elementary school sites, including asbestos abatement, new tackboards, chalk boards and makerboard installations. Work also includes new door hardware, cielings, and paint throug muck of the schools.
Repeat Client: Roman Catholic Diocese of Fresno
Saint Joseph's Catholic Church of Selma -
New Social Hall and Classrooms
Selma, CA
Project includes preconstruction and construction services on a new 13,000 square foot social hall, which will include classrooms, showers, bathrooms, a commercial kitchen, and a covered patio for gatherings. In addition, two new wood privacy gates will be installed to match the aesthetic details of the church.
County of Tulare
Renovation and Expansion of the Visalia Library
Visalia, CA
New Lobby
Construct a new lobby between the two existing buildings to create a unified library facility. Total area approximately 1,510 square feet.
Existing 1936 building
Complete renovation to convert existing vacant building into a children's library. Total area of approximately 9,990 square feet.
Existing 1976 building
Selected, partial renovation of existing library, primarly to upgrade computer lab area, update bathroom, elevator and door hardware for ADA compliance and upgrade some finishes. Total area of approximately 32, 570 square feet.
(Click here for more Library Info)
(Click here for the latest new on this project)
New Client: Children's Hosptial Central Valley
Bed Tower Remodel
Madera, CA
Ground floor – Demolition of existing playrooms to add patient beds. Remodel of conference room decreasing its size to add a semi-private patient room. Remodel of existing empty space on hospital bridges to add a new office.
First floor – Demolition of existing playrooms to add patient beds. Remodel of exiting empty spaces on hospital bridges to add new offices. New construction involves new non-bearing walls, wall finishes, door, windows, mechanical ducting, plumbing and electrical.
Total SQFT 4,538
Repeat Client: Saint Agens Medical Center
Gamma Knife
Fresno, CA
New
Gamma Knife -- a $4.5 million piece of equipment that allows doctors to target what are often considered inoperable tumors and lesions in the head and neck. Saint Agnes is the only hospital between Sacramento and Bakersfield to have the equipment, and one of only 200 worldwide, hospital officials said. Even fewer hospitals have the newest version of Gamma Knife, the Perfexion, that will be used at Saint Agnes.
TOTAL SQFT 2,596
(Click here for more Gamm Knife Info)
|